Millimeter-precise surveying for a future-proof rail infrastructure

In the port of Duisburg, it was all about maximum precision recently - our measuring team from the HI Group was deployed in the track area. The aim was to carry out a Network measurement for fixed point determination and a manual switch measurement as a basis for further 3D track detection using the latest scanning technology.

Net metering Port of Duisburg

High-precision data for reliable construction planning

With state-of-the-art measuring instruments from Leica Geosystems our surveying technicians ensured that Results accurate to the millimeterwhich are indispensable both for ongoing operations and for future infrastructure measures. Precise measurement data is particularly crucial in the area of track infrastructure - it enables the safe planning and implementation of construction projects in the sensitive environment of rail traffic.

3D scanning as a key technology in the rail sector

The survey carried out provides the Basis for precise 3D capture of the track system. The combination of classic surveying techniques and modern Scanner technology allows complete digital mapping of the environment - efficiently, quickly and accurately. This data is important for, among other things:

  • the Planning of construction cranes and construction site accesses,

  • the Bridge renovation in the area of the switches

  • as well as for the preventive maintenance of existing track sections.

Bridge renovation ahead: Manual measurement for maximum accuracy

Another field of activity for our team was the creation of a Manual measurement of the switchesfor the upcoming Bridge reconstruction is required. Here, too, maximum precision was required - because every millimeter counts when it comes to load-bearing infrastructure.

The result: precision you can rely on

As an experienced engineering office specializing in infrastructure, Track construction and 3D scanWe support clients such as the Amberg Group and Deutsche Bahn in the safe and future-oriented implementation of construction projects. Our assignments thus make a decisive contribution to the sustainable maintenance and modernization of the German railroad infrastructure.